This week, the commission accepted the completed construction of the facility: "Overhaul of the GTS and pumping stations for an irrigated plot on an area of 500 hectares near the village of Novy Michan of the Sabinsky municipal district of the Republic of Tatarstan". The overhaul was carried out within the framework of the State Program "Development of agriculture and regulation of agricultural products, raw materials and food markets in the Republic of Tatarstan for 2013-2025".
Diesel pumping stations have been switched to energy-saving electrified pumping units, which will reduce irrigation costs. The irrigated areas will be 582.5 hectares. Major repairs at this facility will increase the yield of grain crops to 35-40 c/ ha, perennial grasses to 50-60 c/ ha. Vegetable crops are also planned to be cultivated on the irrigated area.
Also, the construction and restoration works were accepted by the commission: "Flood control measures at a hydraulic structure near the village of Yanyl of the Kukmor district of the Republic of Tatarstan". The Kukmor irrigation system, the water source of which is a water intake structure located on the Burets river near the village of Yanyl, was commissioned in 1978 and solves the tasks of irrigation of agricultural land and ensuring an increase in the volume of crop production in the Kukmor district. At the facility, the fastening of the supply channel was restored, as well as the fastening of the entrance part of the spillway structure.